Definition:
A Risk Matrix is a visual tool that assesses risk by evaluating the severity and likelihood of potential events. This often uses colors to communicate risk levels.

Do not confuse with a Risk Graph.

calibrated risk matrix showing probability and severity bins.

Key Points:

  • Can be qualitative, semi-quantitative, or calibrated.
  • Calibrated risk matrix is a very common tool and is a type of risk matrix. See figure.
  • Forms basis for many corporate risk assessment methodologies.

Example:
A 5×5 risk matrix color-codes events into green (acceptable) and red (intolerable) zones.

See Also: risk graph, calibrated risk matrix, PLL

Cited Source:

  • IEC 61511-3:2016, Annex G
  • CCPS Guidelines for Risk-Based Process Safety.
  • Wikipedia – Risk Matrix article